Balance of plant civils and electrical infrastructure for 9 Siemens 2.3MW turbines.
Works included:
- Design and construction of site access tracks and crane hard standings using locally sourced materials (cement stabilised)
- Construction of marine unloading platform
- Improvements to the public highway
- Construction of piled reinforced concrete turbine foundations
- Construction of control building
- 6km of HV cable installation
- Electrical design and installation
- Supervision of delivery and erection of turbines
- Landscaping and reinstatement