Section 278 works to facilitate access onto a 74-acre site for proposed housing and retail development on the outskirts of Haverfordwest.
Work included:
- Creation of a new roundabout on the A487 and enlarging an existing one to allow for new access roads to/from future retail and housing developments
- Tarmac surfacing
- Construction of associated footpaths and cycle ways
- Installation of services to new development boundary
- Landscaping to roundabout to tie into PCC ‘gateway project’
- Associated street lighting, signage and safety barriers
- Pre start ecological works to relocate wildlife habitats, including slow worms
- Surface water drainage, attenuation (storage) drainage tank, foul water drains
All of the works constructed on a traffic sensitive section of the A487 entering Haverfordwest town.
- Surfacing -11,000m 2
- Kerbing -3,700 lin/m
- Bulk Excavation – 20,000m 3
- Drainage – 1,900lin/m
A site visitor centre